Freedom Rope Long Lead

K9 Kouture

$63.42
Availability:
Usually ships in 0-3 weeks
Rainbow Hardware:
Zinc Alloy or Iron
Rose Gold Hardware:
Zinc Alloy or Iron
Matte Black:
PVD Plated Solid Brass
Gold:
Solid Brass
Silver:
Nickel Plated Solid Brass
Locking Carabiner:
Airplane Aluminum (Break Load 880lbs)
Adding to cart… The item has been added

Our long leads are wonderful for outdoor adventures as well as training leads. 

Features:

  • All K9 gear is made-to-order, by hand
  • 100% authentic Biothane material, a vegan leather that is waterproof, washable and odor-proof! 
  • Hardware Options: Silver (nickel plated brass), Gold (solid brass), Matte Black, Rose Gold & Rainbow! (+$5 for matte black, rose gold or rainbow). Specialty color hardware is made of solid zinc alloy. They hold on tight to the bold metallic finishes and resist rust and corrosion. Two layers of clear oil are baked on top for a truly mesmerizing shiny finish. 
  • Made with long lasting, quality products leaving you with a product that will last! 

 

K9 Kouture is not responsible for chew damage of your gear.
We’re looking for stars!
Let us know what you think