Freedom Long Lead

K9 Kouture

$52.00
Availability:
Usually ships in 0-2 weeks
Rainbow Hardware:
Zinc Alloy or Iron
Rose Gold Hardware:
Zinc Alloy or Iron
Matte Black:
PVD Plated Solid Brass
Gold:
Solid Brass
Silver:
Nickel Plated Solid Brass
Locking Carabiner:
Airplane Aluminum (Break Load 880lbs)
Adding to cart… The item has been added

Our long leads are wonderful for outdoor adventures as well as training leads. 

Features:

  • All K9 gear is made-to-order, by hand
  • 100% authentic Biothane material, a vegan leather that is waterproof, washable and odor-proof! 
  • Hardware Options: Silver (nickel plated brass), Gold (solid brass), Matte Black, Rose Gold & Rainbow! (+$5 for matte black, rose gold or rainbow). Specialty color hardware is made of solid zinc alloy. They hold on tight to the bold metallic finishes and resist rust and corrosion. Two layers of clear oil are baked on top for a truly mesmerizing shiny finish. 
  • Made with long lasting, quality products leaving you with a product that will last! 

 

At K9 Kouture, every item is handmade with care using high-quality materials designed for everyday use. We stand behind the craftsmanship of our products and offer a 1-year warranty against defects in materials or workmanship from the date of purchase. This warranty covers: Hardware failures due to manufacturing defects Assembly defects resulting from normal use Material defects present at the time of manufacture This warranty does not cover: Damage resulting from chewing, scratching, digging, or other destructive behavior Normal wear and tear, including cosmetic fading, scuffing, scratches, or finish wear on hardware Damage caused by misuse, accidents, improper storage, or improper care Products that have been altered or modified after purchase Improper sizing or measurement errors provided by the customer at the time of ordering Customers are responsible for ensuring all measurements submitted during the ordering process are accurate. Because many of our products are custom-made to the specifications provided, we cannot offer refunds or replacements for items ordered in the wrong size due to incorrect measurements. If you believe your product has a manufacturing defect, please contact us with photos and a description of the issue. Approved warranty claims will be repaired or replaced at our discretion. The safety and condition of all gear should be regularly inspected before use. No dog gear is indestructible, and owners are responsible for determining whether a product remains safe and appropriate for their dog's use.